PROJECT COOLIDGE PASSWORD PROTECTED

ASSIGNED TO STEVE AMAN

PROJECT COOLIDGE

STEP ONE

ORDER MATERIALS FOR A 1.5 TON PACKAGE UNIT

AND A CAGE

WE NEED  measurements of the cage

do not install without a cage

cage must be delivered first then the unit 2cd

i do not want an inside outside style a c unit

preston said he has floor ducts(please verify with a photo

from preston

STEP TWO

POUR CONCRETE PAD

OR BUY MULTIPLE CONCRETE PADS PREMADE

UNIT MAY NOT SIT ON TOP OF PLUMBING PIPES OR 

ON TOP OF SEPTIC TANK LID